BH GSO IEC 60071-2:2024
IEC 60071-2:2023
Bahraini Standard
Current Edition
·
Approved on
21 November 2024
Insulation co-ordination - Part 2: Application guidelines
BH GSO IEC 60071-2:2024 Files
No files for this standard are available in the store currently.
Obtaining this standard through the store is currently unavailable. You can acquire it directly from its source.
BH GSO IEC 60071-2:2024 Scope
IEC 60071-2:2023 is available as IEC 60071-2:2023 RLV which contains the International Standard and its Redline version, showing all changes of the technical content compared to the previous edition.IEC 60071-2:2023 constitutes application guidelines and deals with the selection of insulation levels of equipment or installations for three-phase AC systems. Its aim is to give guidance for the determination of the rated withstand voltages for ranges I and II of IEC 60071‑1 and to justify the association of these rated values with the standardized highest voltages for equipment. This association is for insulation co-ordination purposes only. The requirements for human safety are not covered by this document. This document covers three-phase AC systems with nominal voltages above 1 kV, phase-to-earth, phase-to-phase and longitudinal insulation. It has the status of a horizontal standard in accordance with IEC Guide 108. This edition includes the following significant technical changes with respect to the previous edition:
a) Clause 4 Concepts governing the insulation co-ordination has been added.
b) Subclause 5.3 has been revised, and Subclause 5.4 Detailed simulation has been added because it is widely applied in the recent practices of insulation coordination.
c) Special considerations for cable line and GIL/GIB have been added in Clause 9.
d) Annex K (informative) Application of line shunt reactor to limitation of TOV and SFO in high voltage overhead transmission lines has been added.
e) Annex L (informative) Calculation of lightning stroke rate and lightning outage rate has been added.
a) Clause 4 Concepts governing the insulation co-ordination has been added.
b) Subclause 5.3 has been revised, and Subclause 5.4 Detailed simulation has been added because it is widely applied in the recent practices of insulation coordination.
c) Special considerations for cable line and GIL/GIB have been added in Clause 9.
d) Annex K (informative) Application of line shunt reactor to limitation of TOV and SFO in high voltage overhead transmission lines has been added.
e) Annex L (informative) Calculation of lightning stroke rate and lightning outage rate has been added.
Best Sellers From Electrical Sector
GSO 2530:2016
Gulf Standard
Energy Labelling And Minimum Energy Performance Requirements For Air-Conditioners
GSO 34:2007
Gulf Technical Regulation
LEAD-ACID STARTER BATTERIES USED FOR
MOTOR VEHICLES AND INTERNAL
COMBUSTION ENGINES
BH GSO 34:2015
GSO 34:2007
Bahraini Technical Regulation
LEAD-ACID STARTER BATTERIES USED FOR
MOTOR VEHICLES AND INTERNAL
COMBUSTION ENGINES
GSO 35:2007
Gulf Standard
Methods of test
for lead-acid starter batteries used for motor vehicles
and internal combustion engines
Recently Published from Electrical Sector
GSO IEC 61058-2-1:2025
IEC 61058-2-1:2018
Gulf Standard
Switches for appliances - Part 2-1: Particular requirements for cord switches
GSO IEC 60034-2-3:2025
IEC 60034-2-3:2024
Gulf Standard
Rotating electrical machines - Part 2-3: Specific test methods for determining losses and efficiency of converter-fed AC motors
GSO IEC 60404-12:2025
IEC 60404-12:2023
Gulf Standard
Magnetic materials - Part 12: Methods of test for the assessment of the thermal endurance of surface insulation coatings on electrical steel strip and sheet
GSO ISO 30061:2025
ISO 30061:2007
Gulf Standard
Emergency lighting