BH GSO IEC 61400-26-1:2024
IEC 61400-26-1:2019
Bahraini Standard
Current Edition
·
Approved on
21 November 2024
Wind energy generation systems - Part 26-1: Availability for wind energy generation systems
BH GSO IEC 61400-26-1:2024 Files
No files for this standard are available in the store currently.
Obtaining this standard through the store is currently unavailable. You can acquire it directly from its source.
BH GSO IEC 61400-26-1:2024 Scope
IEC 61400-26-1:2019 defines an information model from which time-based, and production-based availability indicators for services can be derived and reported.
The purpose is to provide standardised metrics that can be used to create and organise methods for availability calculation and reporting according to the user’s needs.
The document provides information categories, which unambiguously describe how data is used to characterise and categorise the operation. The information model specifies category priority for discrimination between possible concurrent categories. Further, the model defines entry and exit criteria to allocate fractions of time and production values to the proper information category. A full overview of all information categories, exit and entry criteria is given in Annex.
The document can be applied to any number of WTGSs, whether represented by an individual turbine, a fleet of wind turbines, a wind power station or a portfolio of wind power stations. A wind power station is typically made up of all WTGSs, functional services and balance of plant elements as seen from the point of common coupling.
This first edition cancels and replaces IEC TS 61400-26-1:2011, IEC TS 61400-26-2:2014 and IEC TS 61400-26-3:2016.
The purpose is to provide standardised metrics that can be used to create and organise methods for availability calculation and reporting according to the user’s needs.
The document provides information categories, which unambiguously describe how data is used to characterise and categorise the operation. The information model specifies category priority for discrimination between possible concurrent categories. Further, the model defines entry and exit criteria to allocate fractions of time and production values to the proper information category. A full overview of all information categories, exit and entry criteria is given in Annex.
The document can be applied to any number of WTGSs, whether represented by an individual turbine, a fleet of wind turbines, a wind power station or a portfolio of wind power stations. A wind power station is typically made up of all WTGSs, functional services and balance of plant elements as seen from the point of common coupling.
This first edition cancels and replaces IEC TS 61400-26-1:2011, IEC TS 61400-26-2:2014 and IEC TS 61400-26-3:2016.
Best Sellers From Electrical Sector
GSO 2530:2016
Gulf Standard
Energy Labelling And Minimum Energy Performance Requirements For Air-Conditioners
GSO 34:2007
Gulf Technical Regulation
LEAD-ACID STARTER BATTERIES USED FOR
MOTOR VEHICLES AND INTERNAL
COMBUSTION ENGINES
BH GSO 34:2015
GSO 34:2007
Bahraini Technical Regulation
LEAD-ACID STARTER BATTERIES USED FOR
MOTOR VEHICLES AND INTERNAL
COMBUSTION ENGINES
GSO 35:2007
Gulf Standard
Methods of test
for lead-acid starter batteries used for motor vehicles
and internal combustion engines
Recently Published from Electrical Sector
GSO CEN/TR 16999:2026
CEN/TR 16999:2019
Gulf Standard
Solar energy systems for roofs - Requirements for structural connections to solar panels
GSO ISO 20816-21:2026
ISO 20816-21:2025
Gulf Standard
Mechanical vibration — Measurement and evaluation of machine vibration — Part 21: Horizontal axis wind turbines
GSO IEC 61362:2026
IEC 61362:2024
Gulf Standard
Guidelines to specification of hydraulic turbine governing systems
GSO IEC TS 62271-313:2026
IEC TS 62271-313:2025
Gulf Standard
High-voltage switchgear and controlgear - Part 313: Direct current circuit-breakers