BH GSO IEC 61400-26-1:2024
IEC 61400-26-1:2019
Bahraini Standard
Current Edition
·
Approved on
21 November 2024
Wind energy generation systems - Part 26-1: Availability for wind energy generation systems
BH GSO IEC 61400-26-1:2024 Files
No files for this standard are available in the store currently.
Obtaining this standard through the store is currently unavailable. You can acquire it directly from its source.
BH GSO IEC 61400-26-1:2024 Scope
IEC 61400-26-1:2019 defines an information model from which time-based, and production-based availability indicators for services can be derived and reported.
The purpose is to provide standardised metrics that can be used to create and organise methods for availability calculation and reporting according to the user’s needs.
The document provides information categories, which unambiguously describe how data is used to characterise and categorise the operation. The information model specifies category priority for discrimination between possible concurrent categories. Further, the model defines entry and exit criteria to allocate fractions of time and production values to the proper information category. A full overview of all information categories, exit and entry criteria is given in Annex.
The document can be applied to any number of WTGSs, whether represented by an individual turbine, a fleet of wind turbines, a wind power station or a portfolio of wind power stations. A wind power station is typically made up of all WTGSs, functional services and balance of plant elements as seen from the point of common coupling.
This first edition cancels and replaces IEC TS 61400-26-1:2011, IEC TS 61400-26-2:2014 and IEC TS 61400-26-3:2016.
The purpose is to provide standardised metrics that can be used to create and organise methods for availability calculation and reporting according to the user’s needs.
The document provides information categories, which unambiguously describe how data is used to characterise and categorise the operation. The information model specifies category priority for discrimination between possible concurrent categories. Further, the model defines entry and exit criteria to allocate fractions of time and production values to the proper information category. A full overview of all information categories, exit and entry criteria is given in Annex.
The document can be applied to any number of WTGSs, whether represented by an individual turbine, a fleet of wind turbines, a wind power station or a portfolio of wind power stations. A wind power station is typically made up of all WTGSs, functional services and balance of plant elements as seen from the point of common coupling.
This first edition cancels and replaces IEC TS 61400-26-1:2011, IEC TS 61400-26-2:2014 and IEC TS 61400-26-3:2016.
Best Sellers From Electrical Sector
GSO 2530:2016
Gulf Standard
Energy Labelling And Minimum Energy Performance Requirements For Air-Conditioners

GSO 34:2007
Gulf Technical Regulation
LEAD-ACID STARTER BATTERIES USED FOR
MOTOR VEHICLES AND INTERNAL
COMBUSTION ENGINES

BH GSO 34:2015
GSO 34:2007
Bahraini Technical Regulation
LEAD-ACID STARTER BATTERIES USED FOR
MOTOR VEHICLES AND INTERNAL
COMBUSTION ENGINES


GSO 35:2007
Gulf Standard
Methods of test
for lead-acid starter batteries used for motor vehicles
and internal combustion engines

Recently Published from Electrical Sector
GSO 195:1994
Gulf Standard
METHODS OF TEST FOR
ADHESIVE INSULATING TAPES FOR
ELECTRICAL PURPOSES

GSO 31:1984
Gulf Standard
METHODS OF TEST FOR
PVC-INSULATED CABLES AND CORDS
WITH CIRCULAR COPPER CONDUCTORS

GSO 1842:2007
Gulf Standard
METHODS OF TESTING FOR PLUGS AND SOCKET OUTLETS FOR VOLTAGES FROM 127V AND UP TO 250V FOR HOUSEHOLD AND SIMILAR GENERAL USE

GSO 723:1997
Gulf Standard
Methods of test for telephone sets.
