GSO IEC 60805:2014

IEC 60805:1985
Gulf Standard   Current Edition · Approved on 25 December 2014

Guide for commissioning, operation and maintenance of storage pumps and of pump-turbines operating as pumps

GSO IEC 60805:2014 Files

English 47 Pages
Current Edition Reference Language

GSO IEC 60805:2014 Scope

The purpose of this guide is to establish, in a general way, suitable procedures for commissioning a) non-reversible hydraulic machines without movable wicket-gates, i.e. storage pumps; b) reversible hydraulic machines with fixed blade impellers and without movable wicket-gates, operating as pumps; c) reversible hydraulic machines with fixed blade impellers and with movable wicket-gates, operating as pumps; d) reversible hydraulic machines with adjustable impeller blades and movable wicket-gates, operating as pumps. and associated equipment. This guide also indicates how such machines and equipment should be operated and maintained. This guide applies to storage pumps and reversible pump-turbines of all types, especially to large units coupled to electrical motor-generators. The guide excludes matters of purely commercial interest, except those inextricably bound up with the conduct of commissioning, operation and maintenance. It is understood that a document of this type will be binding only if, and to the extent that, both contract parties have agreed upon it. Wherever the guide specifies that documents, drawings or information are to be supplied by a manufacturer (or by manufacturers), each individual manufacturer shall be required to furnish the appropriate information for his own supply only. The guide is not concerned with water conduits, gates, valves, drainage pumps, cooling water equipment, generators, etc., except where they cannot be separated from the machine and its equipment. It is assumed that the turbine of the set or the pump-turbine operating as turbine has been commissioned beforehand in accordance with IEC Publication 545: Guide for Commissioning, Operation and Maintenance of Hydraulic Turbines, where applicable. Where this is not possible, an individual commissioning procedure shall be established at an early stage of plan design.

Best Sellers From Electrical Sector

GSO 2530:2016
 
Gulf Standard
Energy Labelling And Minimum Energy Performance Requirements For Air-Conditioners
GSO 34:2007
 
Gulf Technical Regulation
LEAD-ACID STARTER BATTERIES USED FOR MOTOR VEHICLES AND INTERNAL COMBUSTION ENGINES
BH GSO 34:2015
GSO 34:2007 
Bahraini Technical Regulation
LEAD-ACID STARTER BATTERIES USED FOR MOTOR VEHICLES AND INTERNAL COMBUSTION ENGINES
GSO 35:2007
 
Gulf Standard
Methods of test for lead-acid starter batteries used for motor vehicles and internal combustion engines

Recently Published from Electrical Sector

GSO CEN/TR 16999:2026
CEN/TR 16999:2019 
Gulf Standard
Solar energy systems for roofs - Requirements for structural connections to solar panels
GSO ISO 20816-21:2026
ISO 20816-21:2025 
Gulf Standard
Mechanical vibration — Measurement and evaluation of machine vibration — Part 21: Horizontal axis wind turbines
GSO IEC 61362:2026
IEC 61362:2024 
Gulf Standard
Guidelines to specification of hydraulic turbine governing systems
GSO IEC TS 62271-313:2026
IEC TS 62271-313:2025 
Gulf Standard
High-voltage switchgear and controlgear - Part 313: Direct current circuit-breakers