GSO IEC 60071-2:2024 Scope
IEC 60071-2:2023 is available as IEC 60071-2:2023 RLV which contains the International Standard and its Redline version, showing all changes of the technical content compared to the previous edition.IEC 60071-2:2023 constitutes application guidelines and deals with the selection of insulation levels of equipment or installations for three-phase AC systems. Its aim is to give guidance for the determination of the rated withstand voltages for ranges I and II of IEC 60071‑1 and to justify the association of these rated values with the standardized highest voltages for equipment. This association is for insulation co-ordination purposes only. The requirements for human safety are not covered by this document. This document covers three-phase AC systems with nominal voltages above 1 kV, phase-to-earth, phase-to-phase and longitudinal insulation. It has the status of a horizontal standard in accordance with IEC Guide 108. This edition includes the following significant technical changes with respect to the previous edition:
a) Clause 4 Concepts governing the insulation co-ordination has been added.
b) Subclause 5.3 has been revised, and Subclause 5.4 Detailed simulation has been added because it is widely applied in the recent practices of insulation coordination.
c) Special considerations for cable line and GIL/GIB have been added in Clause 9.
d) Annex K (informative) Application of line shunt reactor to limitation of TOV and SFO in high voltage overhead transmission lines has been added.
e) Annex L (informative) Calculation of lightning stroke rate and lightning outage rate has been added.
a) Clause 4 Concepts governing the insulation co-ordination has been added.
b) Subclause 5.3 has been revised, and Subclause 5.4 Detailed simulation has been added because it is widely applied in the recent practices of insulation coordination.
c) Special considerations for cable line and GIL/GIB have been added in Clause 9.
d) Annex K (informative) Application of line shunt reactor to limitation of TOV and SFO in high voltage overhead transmission lines has been added.
e) Annex L (informative) Calculation of lightning stroke rate and lightning outage rate has been added.
Best Sellers From Electrical Sector
GSO 2530:2016
Gulf Standard
Energy Labelling And Minimum Energy Performance Requirements For Air-Conditioners
GSO 34:2007
Gulf Technical Regulation
LEAD-ACID STARTER BATTERIES USED FOR
MOTOR VEHICLES AND INTERNAL
COMBUSTION ENGINES
BH GSO 34:2015
GSO 34:2007
Bahraini Technical Regulation
LEAD-ACID STARTER BATTERIES USED FOR
MOTOR VEHICLES AND INTERNAL
COMBUSTION ENGINES
GSO 35:2007
Gulf Standard
Methods of test
for lead-acid starter batteries used for motor vehicles
and internal combustion engines
Recently Published from Electrical Sector
GSO IEC 61558-2-2:2024
IEC 61558-2-2:2022
Gulf Standard
Safety of transformers, reactors, power supply units and combinations thereof - Part 2-2: Particular requirements and tests for control transformers and power supply units incorporating control transformers
GSO IEC 60664-1:2024
IEC 60664-1:2020
Gulf Standard
Insulation coordination for equipment within low-voltage supply systems - Part 1: Principles, requirements and tests
GSO IEC 61936-2:2024
IEC 61936-2:2023
Gulf Standard
Power installations exceeding 1 kV AC and 1,5 kV DC - Part 2: DC
GSO IEC TS 62915:2024
IEC TS 62915:2023
Gulf Standard
Photovoltaic (PV) modules - Type approval, design and safety qualification - Retesting