GSO IEC 61400-26-1:2024
IEC 61400-26-1:2019
Gulf Standard
Current Edition
·
Approved on
14 October 2024
Wind energy generation systems - Part 26-1: Availability for wind energy generation systems
GSO IEC 61400-26-1:2024 Files
No files are available for this standard right now!
GSO IEC 61400-26-1:2024 Scope
IEC 61400-26-1:2019 defines an information model from which time-based, and production-based availability indicators for services can be derived and reported.
The purpose is to provide standardised metrics that can be used to create and organise methods for availability calculation and reporting according to the user’s needs.
The document provides information categories, which unambiguously describe how data is used to characterise and categorise the operation. The information model specifies category priority for discrimination between possible concurrent categories. Further, the model defines entry and exit criteria to allocate fractions of time and production values to the proper information category. A full overview of all information categories, exit and entry criteria is given in Annex.
The document can be applied to any number of WTGSs, whether represented by an individual turbine, a fleet of wind turbines, a wind power station or a portfolio of wind power stations. A wind power station is typically made up of all WTGSs, functional services and balance of plant elements as seen from the point of common coupling.
This first edition cancels and replaces IEC TS 61400-26-1:2011, IEC TS 61400-26-2:2014 and IEC TS 61400-26-3:2016.
The purpose is to provide standardised metrics that can be used to create and organise methods for availability calculation and reporting according to the user’s needs.
The document provides information categories, which unambiguously describe how data is used to characterise and categorise the operation. The information model specifies category priority for discrimination between possible concurrent categories. Further, the model defines entry and exit criteria to allocate fractions of time and production values to the proper information category. A full overview of all information categories, exit and entry criteria is given in Annex.
The document can be applied to any number of WTGSs, whether represented by an individual turbine, a fleet of wind turbines, a wind power station or a portfolio of wind power stations. A wind power station is typically made up of all WTGSs, functional services and balance of plant elements as seen from the point of common coupling.
This first edition cancels and replaces IEC TS 61400-26-1:2011, IEC TS 61400-26-2:2014 and IEC TS 61400-26-3:2016.
Best Sellers From Electrical Sector
GSO 2530:2016
Gulf Standard
Energy Labelling And Minimum Energy Performance Requirements For Air-Conditioners
GSO 34:2007
Gulf Technical Regulation
LEAD-ACID STARTER BATTERIES USED FOR
MOTOR VEHICLES AND INTERNAL
COMBUSTION ENGINES
BH GSO 34:2015
GSO 34:2007
Bahraini Technical Regulation
LEAD-ACID STARTER BATTERIES USED FOR
MOTOR VEHICLES AND INTERNAL
COMBUSTION ENGINES
GSO 35:2007
Gulf Standard
Methods of test
for lead-acid starter batteries used for motor vehicles
and internal combustion engines
Recently Published from Electrical Sector
GSO IEC 61558-2-2:2024
IEC 61558-2-2:2022
Gulf Standard
Safety of transformers, reactors, power supply units and combinations thereof - Part 2-2: Particular requirements and tests for control transformers and power supply units incorporating control transformers
GSO IEC 60664-1:2024
IEC 60664-1:2020
Gulf Standard
Insulation coordination for equipment within low-voltage supply systems - Part 1: Principles, requirements and tests
GSO IEC 61936-2:2024
IEC 61936-2:2023
Gulf Standard
Power installations exceeding 1 kV AC and 1,5 kV DC - Part 2: DC
GSO IEC TS 62915:2024
IEC TS 62915:2023
Gulf Standard
Photovoltaic (PV) modules - Type approval, design and safety qualification - Retesting