ISO 7551:2023

International Standard   Current Edition · Approved on 02 May 2023

Dentistry — Endodontic absorbent points

ISO 7551:2023 Files

English 12 Pages
Current Edition
BHD 30.86

ISO 7551:2023 Scope

This document specifies the requirements and test methods for sterilized absorbent points used in endodontic procedures. Absorbent points are marketed sterilized or non-sterilized. The requirements apply to absorbent points which have been sterilized once in a manner approved by the manufacturer. This document specifies numerical systems and a colour-coding system for designating the sizes of absorbent points.

Clause 7 specifies the labelling and packaging needed, including the instructions for use. A claim by the manufacturer that the contents of the unopened pack are sterile is the responsibility of the manufacturer (see Table 2). This document does not specify requirements or test methods for sterility.

NOTE 1 Reference to applicable national regulations can be made.

Reference is made to internationally accepted pharmacopoeia.

NOTE 2 National requirements can apply.

Standards on methods of validating sterilization processes are also available: ISO 11137-1, ISO 11137-2 and ISO 11137-3.

Best Sellers

GSO 150-2:2013
 
Gulf Standard
Expiration dates for food products - Part 2 : Voluntary expiration dates
BH GSO 150-2:2015
GSO 150-2:2013 
Bahraini Standard
Expiration dates for food products - Part 2 : Voluntary expiration dates
BH GSO 2055-1:2016
GSO 2055-1:2015 
Bahraini Technical Regulation
HALAL FOOD - Part 1 : General Requirements
GSO 2055-1:2015
 
Gulf Technical Regulation
HALAL FOOD - Part 1 : General Requirements

Recently Published

ISO 22544:2025
 
International Standard
Laboratory design — Vocabulary
ISO 6670:2025
 
International Standard
Instant coffee — Sampling method for bulk units with liners
ISO/IEC TR 25219:2025
 
International Standard
Personal identification — ISO-compliant driving licence — Considerations for early adopters of ISO/IEC 18013-7
ISO 13315-5:2025
 
International Standard
Environmental management for concrete and concrete structures — Part 5: Execution of concrete structures