ISO 9239-1:2025

International Standard   Current Edition · Approved on 25 June 2025

Reaction to fire tests for floorings — Part 1: Determination of the burning behaviour using a radiant heat source

ISO 9239-1:2025 Files

English 30 Pages
Current Edition
BHD 73.54

ISO 9239-1:2025 Scope

This document specifies a method for assessing the wind-opposed burning behaviour and spread of flame of horizontally mounted floorings exposed to a heat flux radiant gradient in a test chamber, when ignited with pilot flames. Annex A gives details of assessing the smoke development, when required.

This method is applicable to all types of flooring, e.g. textile carpet, cork, wood, rubber and plastics coverings as well as coatings. Results obtained by this method reflect the reaction to fire performance of the flooring, including any substrate if used. Modifications of the backing, bonding to a substrate, underlay or other changes of the flooring can affect test results. It cannot be used alone to describe or appraise the fire hazard or fire risk of floorings under actual fire conditions.

Information on the precision of the test method is given in Annex B.

Best Sellers

GSO 150-2:2013
 
Gulf Standard
Expiration dates for food products - Part 2 : Voluntary expiration dates
BH GSO 150-2:2015
GSO 150-2:2013 
Bahraini Standard
Expiration dates for food products - Part 2 : Voluntary expiration dates
BH GSO 2055-1:2016
GSO 2055-1:2015 
Bahraini Technical Regulation
HALAL FOOD - Part 1 : General Requirements
GSO 2055-1:2015
 
Gulf Technical Regulation
HALAL FOOD - Part 1 : General Requirements

Recently Published

ISO 22544:2025
 
International Standard
Laboratory design — Vocabulary
ISO 6670:2025
 
International Standard
Instant coffee — Sampling method for bulk units with liners
ISO/IEC TR 25219:2025
 
International Standard
Personal identification — ISO-compliant driving licence — Considerations for early adopters of ISO/IEC 18013-7
ISO 13315-5:2025
 
International Standard
Environmental management for concrete and concrete structures — Part 5: Execution of concrete structures